
01
2026
Welder
Chisinau ,Moldova
The Challenge & Core Task
The main objective for this project was to visually translate what they do into a powerful monumental artwork, completely transforming the industrial environment.
Architecturally, it was a very demanding surface with highly complex access, as a massive staircase splits the entire wall right down the middle. Navigating the height shifts required precise and adaptive execution.
The Vibe
It was an absolute pleasure working with the Metco team—cool, professional, and genuinely nice people. When you connect with the clients on that level, even the most challenging grid becomes a smooth and rewarding process.
Surface
108-216 m² (6-12 × 18 m)
Execution
4 days
Materials
~200 aerosol cans
Access
Wheeled boom lift
Primary Colors
Accent Colors
